Analysis of Squeezing Phenomenon in the Headrace Tunnel of Chameliya Project, Nepal
DOI:
https://doi.org/10.3126/hn.v13i0.10039Keywords:
Tunnel squeezing, Headrace tunnel, Chameliya Hydroelectric Project, Tunnel deformation, Support pressureAbstract
The headrace tunnel of Chameliya Hydroelectric Project, Nepal has faced severe squeezing problems from chainage 3+100m to 3+900m. Due to the severe squeezing and deformation, the tunnel cross section has narrowed considerably along this 800m long tunnel stretch. The tunnel wall closure (deformation) is mostly well over 1 m and the maximum recorded closure exceeds 2m. This paper assesses the squeezing phenomenon along this tunnel stretch through evaluation of rock mass properties and support pressure. Three different methods (two analytical and one 2D finite element numerical modeling program) are used in this analysis. The finding is that it is possible to predict extent of squeezing in tunnel if more than one method is used to verify rock mass mechanical properties.
DOI: http://dx.doi.org/10.3126/hn.v13i0.10039
HYDRO NEPAL Journal of Water, Energy and Environment
Issue No. 13, July 2013
Page: 44-51
Uploaded date: 3/13/2014
Downloads
Downloads
Published
How to Cite
Issue
Section
License
The copyright of the articles and papers published is held by HYDRO Nepal Journal.
The views and interpretation in this journal are those of author(s), and HYDRO Nepal does not bear any responsibility for the views expressed by authors in the journal.