[1]
“Assessment of Time and Cost Overrun of Province Level Construction Project in Tanahun, Gandaki Province, Nepal”, J. Eng. Iss. Solut., vol. 5, no. 1, pp. 84–102, Apr. 2026, doi: 10.3126/joeis.v5i1.93472.