[1]
“Evaluation of Peaking Time Variation in Power Generation of a Cascaded Hydropower System: A Case Study of Arun River”, J. Eng. Iss. Solut., vol. 4, no. 1, pp. 30–40, Jul. 2025, doi: 10.3126/joeis.v4i1.81562.