[1]
“Comparison of Tunnel Construction Cycle with NTNU Model for the Headrace Tunnel of Seti Khola Hydropower Project ”, J. Eng. Sci., vol. 2, no. 1, pp. 9–13, Dec. 2023, doi: 10.3126/jes2.v2i1.60371.