(1)
Paudel, T. N.; Bhattarai, S. K.; Neupane, U. Analysis of Payment Delay in Road Construction Projects: The Case Road Division Surkhet, Nepal. Int. J. Eng. Technol. and Infras. Dev. 2024, 1 (1), 36-51. https://doi.org/10.3126/injet-indev.v1i1.67935.