THAPALIYA, S.; PRADHANANGA, R.; SHRESTHA, S. Factors Affecting the Waiting Time of Pedestrians at Unsignalized Crosswalks of Kathmandu: A Case Study of Bagbazar and Jamal Crosswalks. International Journal on Engineering Technology, [S. l.], v. 1, n. 2, p. 42–49, 2024. DOI: 10.3126/injet.v1i2.66689. Disponível em: https://nepjol.info/index.php/injet/article/view/66689. Acesso em: 21 nov. 2024.