(1)
Impact Study of the Hetauda-Dhalkewar-Inaruwa Transmission Line on the Operation of Integrated Nepal Power System. Adv. Engin. & Technol. 2023, 3 (1), 139-159. https://doi.org/10.3126/aet.v3i1.60739.