Adhikari, Sijan, Biplove Ghimire, Ghan Bahadur Shrestha, and Chhatra Bahadur Basnet. “Comparison of Tunnel Construction Cycle Time With NTNU Model: A Case Study of Siddhababa Road Tunnel, Palpa, Nepal”. Technical Journal 5, no. 1 (November 26, 2025): 75–80. Accessed December 9, 2025. https://nepjol.info/index.php/TJ/article/view/86893.