Adhikari, Sijan, et al. “Comparison of Tunnel Construction Cycle Time With NTNU Model: A Case Study of Siddhababa Road Tunnel, Palpa, Nepal”. Technical Journal, vol. 5, no. 1, Nov. 2025, pp. 75-80, doi:10.3126/tj.v5i1.86893.