[1]
S. Adhikari, B. Ghimire, G. B. Shrestha, and C. B. Basnet, “Comparison of Tunnel Construction Cycle Time with NTNU Model: A Case Study of Siddhababa Road Tunnel, Palpa, Nepal”, Tech J, vol. 5, no. 1, pp. 75–80, Nov. 2025.