Adhikari, S. (2025) “Comparison of Tunnel Construction Cycle Time with NTNU Model: A Case Study of Siddhababa Road Tunnel, Palpa, Nepal”, Technical Journal, 5(1), pp. 75–80. doi: 10.3126/tj.v5i1.86893.