BHANDARI, G.; RIMAL, B.; NEUPANE, S. Impact Analysis of 220 Kv And 400 Kv Transmission Lines on The Integrated Nepal Power System. Technical Journal, [S. l.], v. 2, n. 1, p. 75–80, 2020. DOI: 10.3126/tj.v2i1.32842. Disponível em: https://nepjol.info/index.php/TJ/article/view/32842. Acesso em: 17 jul. 2024.