ADHIKARI, Sijan; GHIMIRE, Biplove; SHRESTHA, Ghan Bahadur; BASNET, Chhatra Bahadur. Comparison of Tunnel Construction Cycle Time with NTNU Model: A Case Study of Siddhababa Road Tunnel, Palpa, Nepal. Technical Journal, [S. l.], v. 5, n. 1, p. 75–80, 2025. DOI: 10.3126/tj.v5i1.86893. Disponível em: https://nepjol.info/index.php/TJ/article/view/86893. Acesso em: 9 dec. 2025.