[1]
Adhikari, S. et al. 2025. Comparison of Tunnel Construction Cycle Time with NTNU Model: A Case Study of Siddhababa Road Tunnel, Palpa, Nepal. Technical Journal. 5, 1 (Nov. 2025), 75–80. DOI:https://doi.org/10.3126/tj.v5i1.86893.