Oke, S. and Charles-Owaba, O. (2007) “A Fuzzy Linguistic Approach of Preventive Maintenance Scheduling Cost Optimisation”, Kathmandu University Journal of Science, Engineering and Technology, 3(1). doi: 10.3126/kuset.v3i1.64178.