Land Use Planning In Hydropower Development A Case Study Of Upper Tamakoshi Hydroelectric Project. (2012). Kathmandu University Journal of Science, Engineering and Technology, 8(1), 134-141. https://doi.org/10.3126/kuset.v8i1.6053