(1)
Oke, S.; Charles-Owaba, O. A Fuzzy Linguistic Approach of Preventive Maintenance Scheduling Cost Optimisation. Kathmandu University J of Sci, Engineering & Technol 2007, 3 (1). https://doi.org/10.3126/kuset.v3i1.64178.