[1]
G. K. Yadav, N. R. Karki, and B. K. Gautam, “Study of Impact of New Butwal-Gorakhpur 400Kv Transmission Line on the Operation and Reliability of INPS”, J. Adv. Coll. Engin. Mgt., vol. 9, no. 1, pp. 351–361, Nov. 2024.