Study of Impact of New Butwal-Gorakhpur 400Kv Transmission Line on the Operation and Reliability of INPS. (2024). Journal of Advanced College of Engineering and Management, 9(1), 351-361. https://doi.org/10.3126/jacem.v9i1.71463