1.
Study of Impact of New Butwal-Gorakhpur 400Kv Transmission Line on the Operation and Reliability of INPS. J. Adv. Coll. Engin. Mgt. 2024;9(1):351-361. doi:10.3126/jacem.v9i1.71463