[1]
Gurung, C.B. et al. 2026. Optimal Recloser Placement in Rural and Urban 11 kV Distribution Feeders of Nepal Based on Reliability and Cost–Benefit Analysis. Journal of Advanced College of Engineering and Management. 12, 01 (May 2026), 457–468. DOI:https://doi.org/10.3126/jacem.v12i01.93957.