Pun, S. B. (2014). The 400 kV Dhalkebar-Muzaffarpur 140 km Transmission Line Eight Years of Indo-Nepal Labor and Still No Fruit. Hydro Nepal: Journal of Water, Energy and Environment, 14, 77–82. https://doi.org/10.3126/hn.v14i0.11273