[1]
Shrestha, R.S. 2009. Arun-III Project: Nepal’s Electricity Crisis and its Role in Current Load Shedding and Potential Role 10 Years Hence. Hydro Nepal: Journal of Water, Energy and Environment. 4, (May 2009), 30–35. DOI:https://doi.org/10.3126/hn.v4i0.1822.