Interview with Odd Hoftun
DOI:
https://doi.org/10.3126/hn.v8i0.4932Keywords:
Hydro power, Hospital, Development activities in NepalAbstract
Mr. Odd Hoftun toiled more than 50 years in various development activities in Nepal mainly in development of Mission Hospital, Tansen, Palpa, Butwal Technical Institute (BTI) in Butwal; and later in the hydropower development in Butwal and neighbouring Districts of Nepal. He has been instrumental in training several hundreds of skilled technical manpower and establising high value companies such as Butwal Power Company, BTI, Nepal Hydro & Electric Ltd. (NHE), Himal Hydro and General Construction etc. He talked with Jeewan P. Thanju, Editor-in-Chief of HYDRO Nepal.
DOI: http://dx.doi.org/10.3126/hn.v8i0.4932
Hydro Nepal: Journal of Water, Energy and Environment
Issue No. 8, 2011 January
Page: 81-83
Uploaded date: 23 June, 2011
Downloads
Downloads
Published
How to Cite
Issue
Section
License
The copyright of the articles and papers published is held by HYDRO Nepal Journal.
The views and interpretation in this journal are those of author(s), and HYDRO Nepal does not bear any responsibility for the views expressed by authors in the journal.